- R3M inspected and evaluated chloride penetration and contamination within major pump station.
- Design of emergency structural repairs to concrete floor and beams.
- Hidden damage to the steel reinforced concrete structure was discovered and overcome.
- R3M sequenced and staged construction to maintain the integrity of the structure.
- The structural rehabilitation was completed with no impact to operations at the pump station.