Structural Repairs to the Klockner Pump Station; Hamilton Township Department of Water Pollution Control

  • R3M inspected and evaluated chloride penetration and contamination within major pump station.
  • Design of emergency structural repairs to concrete floor and beams.
  • Hidden damage to the steel reinforced concrete structure was discovered and overcome.
  • R3M sequenced and staged construction to maintain the integrity of the structure.
  • The structural rehabilitation was completed with no impact to operations at the pump station.